products centerSHANGHAI SHICHEN MACHINERY AND ELECTRONICS CO.LTD
Feed process: The force produced by the piston is transferred into a pulling motion without any increase in force. The distance ratio is 1:1. |
|
Clamping process: After a transitional phase, the force increases three-fold due to the altered angle of the locking slide, and remains constant until the end of stroke. During the total clamping process, self-locking prevails. Pressure does not have to be maintained. |
|
Release process: By applying pressure to the second port, the lock is released ejecting the bolt at the same time. The usable release force is calculated from force x projected surface area of the sealed diameter. |
Clamping of carriages or slides The high clamping force and the pre-load allow carriages to be fixed free of play. Because of the CyTec locking system the carriage remains locked even after the hydraulic or pneumatic supply is shut off. surface finishing. |
|
Block clamping system With narrow conditions in injection mould machines the use of the block clamping system is recommended which enables the clamping with a stroke movement. The system guarantees highest forces with optimal system rigidity. |
|
Pallet clamping system For transit or insert pallets in accordance with DIN 55201 or similar, we offer the CyTab pallet clamping system. This modification of the three dimensional clamping system is a simple cost effective system that offers high clamp forces and self locking. These units are used with suitable T bolt or double T bolt clamps. The integrated pre-load guarantees fixing of the pallet free of play. On request a lifting function and a transport lock can be integrated. |
|
Clamping of connecting rods for preparation purposes for grinding and surface finishing. |